Metreon
5 story concrete structure Base building renovations 50,500 sf
Pacific Structures is pouring concrete throughout the five story structure at the Metreon. This is a major structural renovation including raising and lowering floor slab elevations, on metal deck slab on grade, and built-up slabs. The building currently houses an operational movie theatre. Pacific -Structures has been pouring starting at 12 am and is completely finished and cleaned by 8 am to avoid noise disruption to the movie theater. Despite restrictive hours, the team is scheduled to complete on time due to their tight planning of logistics and sequencing.
- Architect
- Client