Project Summary
This project entailed extensive base building renovations of an existing mixed-use entertainment complex with movie theater while keeping it in full operation. The key to success was to upgrade the structure and building systems with minimal noise disruption despite intrusive work such as raising and lowering slab elevations, pouring a slab on a new metal deck and an
escalator relocation. The construction team organized all crews to work around the operational hours of the theater often running night shifts. With careful planning, creative sequencing and tight control over logistics, the project was completed on time.
Market Sectors
Project Types
Metreon Remodel
San Francisco, CA