Metreon

5 story concrete structure Base building renovations 50,500 sf

Pacific Structures is pouring concrete throughout the five story structure at the Metreon. This is a major structural renovation including raising and lowering floor slab elevations, on metal deck slab on grade, and built-up slabs. The building currently houses an operational movie theatre. Pacific -Structures has been pouring starting at 12 am and is completely finished and cleaned by 8 am to avoid noise disruption to the movie theater. Despite restrictive hours, the team is scheduled to complete on time due to their tight planning of logistics and sequencing.

Architect
Westfield Design and Construction
Client
Westfield, LLC